Projects / Services

 

S/No County Constituency Project Name Financier Cost (Millions) Scope & Target Areas Status
1 Siaya Bondo, Gem, Alego Usonga Siaya - Bondo Water supply project

 

 

 

 

 

 

 

 

 

 

 

AfDB & GoK

1,560 Rehabilitation of Sidindi Malanga intake works,Laying of new 305m DN 450 steel raw water main, Construction of 12,000m3/day new treatment plant, Rehabilitation of existing treatment plant to produce 7000m3/day, Laying of 4.1km DN450 steel rising main from Sidindi Malanga to Nyamninia reservoir. Rehabilitation 4.1km DN 350 existing rising main. Construction 1 no. 1000m3RC clear water contact tank at Sidindi Malanga, Construction 1 no. 1000m3RC BPT tank at Ngiya, Construction of 2 no. 3000m3 RC storage tanks at Gobei ( supply Bondo town) and Sigana ( supply Siaya town). Construction of 3300m3 RC storage reservoir at Nyamninia. Laying of 46km DN450/350 steel/Upvc transmission main from Nyamninia reservoirs to Bondo and Siaya towns. Laying of 48km DN315/160 Upvc distribution lines in Bondo and Siaya towns. Construction of 24 community water points along the pipeline route. Construction of 5 no. 150m3 elevated steel tanks. Extension of 35km distribution lines of DN160, DN110, DN90 and DN 50 GI/Upvc pipes. Supply and installation of 5 no hydro turbines, Supply of 500 consumer meters. Supply of Operation and maintenance equipment’s 2 no. double cabin vehicle, 2 no. leak detection equipment and 5 no. motor cycles. The project s to serve 200,000 people in Siaya and Bondo towns and its environment. Project commenced in March 2013 and was expected to be completed by March 2016. The Client has issued a notice on delay damages to the Contractor. Commissioning expected in September 2016
2 Kericho Ainamoi Kericho Sewerage Improvement Project

 

 

 

 

 

 

AfDB

201 Installation of Kericho CBD and South CBD sewer line consisting of 365m DN 280 Upvc, 1725m DN 315 Upvc, 1080m DN 450 concrete pipe, 460m DN 525 concrete pipe, 2323m DN 225 Upvc, 209m DN 225 concrete pipe, 1100m DN 160 Upvc pipe. Rehabilitation of Kericho sewerage treatment work comprising of increasing the inlet structure by 500mm, refurbishment of 2 no. primary and secondary sedimentation tanks. Reconstruction of two trickling filters, placing of filter media and introduction of culture. Rehabilitation of four sludge digesters. Refurbishment of sludge drying beds. Replacing of 2 no. reticulation pumps Installation of a masonry perimeter fence and steel gate. Provision of lighting within the treatment works. The project is to serve 70,000 additional people. It will serve 60% of the town by treating 10,000 m3 The project commenced in April 2014 and its physical progress is at 70% complete, The contract was terminated in April 2016 due to slow progress by the Contractor. The project is being retendered.
3 Nyamira Keroka Keroka water supply project

 

 

 

 

 

 

AfDB

769.3 Construction of intake weir on river Kuja, Construction of 3000m3/day treatment plant, Construction of 1 no. 500m3 clear water tank and 1 no. 150m3backwash elevated steel tanks, Laying of 11km DN 250mm steel rising main. Laying of 16.5km DN160-DN40 Upvc distribution lines. Construction of 1no. 500m3 RC tank in Keroka town. Construction 150m3 elevated steel tank at Ichuni. Construction of 2 no. 50m3 masonry tanks. Supply and installation of 4 no. electrical pumps (raw water and clear water). Supply and installation of 1 no. pump station standby Diesel Engine Generator set. The project targets to serve 56, 000 people in Keroka town and its environment. The project started in January 2015 and it’s at 80% completion. Expected completion date in December 2016.
4 Migori Isebania Isebania Water supply

AfDB

  Construction of intake weir on river Hibwa, Construction of 3000m3/day treatment plant, Construction of 1 no. 500m3RC clear water tank and 1 no. 150m3backwash elevated steel tank at treatment plant, Laying of 9.6km DN 250mm steel rising main. Laying of 19.5km DN250-DN40 Upvc distribution lines. Construction of 1no. 1000m3 RC storage tank in Isebania town. Construction of 1 no. 50m3 masonry tank. Supply and installation of 4 no. electrical pumps (raw water and clear water). Supply and installation of 1 no. pump station standby Diesel Engine Generator set. The project targets to serve 56, 000 people in Keroka town and its environment. The project started in January 2015 and it’s at 80% completion. Expected completion date in December 2016.
5 Homa bay Rangwe Rangwe water supply project ( Kosiga dam)

 

 

 

GoK

45 Dam rehabilitation to increase its capacity by 10,000m3, construction of treatment works (2 no. 25m3/hr CFU), Construction of 25m3 steel back wash tankconstruction of 100m3 RC clear water tank, Laying of 1km DN 150 rising main, Construction of 250m3 RC tank at Aimo hills. Construction of pump house, supply and installation of 2 no. high lift and back wash pumps. The project targets to serve 15,000 people. The project commenced in February 2015 and to be completed in August 2016.
6 Kericho Belgut/ Burret Litein water supply system

 

 

 

 

 

 

KFW & GoK

560 Construction of new river intake on River Kimungu, Construction of 7660m DN 600 raw water gravity main. Construction of 13,000m3/day treatment plant. Construction of 1 no. 250m3 elevated backwash steel tank, 1 no. 5000m3 RC storage tank and 1 no. 1000m3 RC tank at Kipsirkong. Laying of 50.6km from DN 60 to DN 600 steel and Upvc transmission and distribution pipelines. Supply and installation of electromechanical equipments. The project targets to serve 118,000 people in Kericho town and 32,400 in Litein town.

For Short term intervention tenders opened, evaluation ongoing. Construction expected to commence in August 2016 and to end in August 2017 (12 months).

Long term intervention detailed design reports submitted. Tender documents to be issued to pre-qualified contractors in June 2016. Ground breaking for Long Term Intervention in January 2017. The project expected to be completed in December 2019 (24months)..

7 Kisii Nyaribari - chache, Kitutu -  chache and Bonchari Kisii water supply expansion works

 

 

 

 

 

 

KFW & GoK

1,500 Improvement of existing Kegati Intake works on river Gucha by construction of steel girder bridge with a spanof 25m across river Gucha over the existing intake weir. Laying of 150m length DN 700 steel raw water pumping main. Expansion of existing Kegati treatment works from capacity of 6500m3/day to 27,000m3/day. Laying of 3.4km DN 700 steel treated water pumping main from Kegati treatment works to Bobaracho tanks. Laying of 2.8km DN 400 steel treated water pumping main from Bobaracho to Nyanguru tank. Construction of 1 no. 5000m3 RC tank at Bobaracho and 1 no. 500m3 RC tank at Nyanguru. Construction of a Booster pumping station at Bobaracho with a capacity 5,700m3/day. Laying of 35km DN 80 to DN 400 Upvc and steel distribution mains. The project targets to serve 150,000 people in Kisii and Nyamira County.

For Short term intervention tenders opened, evaluation ongoing. Construction expected to commence in August 2016 and to end in August 2017 (12 months).

Long term intervention detailed design reports submitted. Tender documents to be issued to pre-qualified contractors in June 2016. Ground breaking for Long Term Intervention in January 2017. The project expected to be completed in December 2019 (24 months).

8 Nyamira West Mugirango Nyamira water supply

 

 

 

 

 

KFW & GoK

461 Rehabilitation of intake works, Construction of 1.3km DN 200 steel new raw pumping main. Rehabilitation of existing Nyamira water treatment plant capacity 4000m3/day. Construction of 1.0km DN 200 steel new treated water pumping main from Nyamira treatment works to Nyamira Hospital storage tank. Improvement of existing Kebirigo pumping station of capacity 1350m3/day by construction of new pump house, installation of new pumps and associated works. Rehabilitation of existing of distribution network with new pipelines sizes DN 50 to DN 200 approximate total length 30km. Construction of 3 no 500m3 RC tank at Ibara, Rangenyo and Nyamira hospital. The project targets to serve 110,000 people in Nyamira.

For Short term intervention tenders opened, evaluation ongoing. Construction expected to commence from August 2016 and to end in August 2017 (12 months).

Long term intervention detailed design reports submitted. Tender documents to be issued to pre-qualified contractors in June 2016. Ground breaking for Long Term Intervention in January 2017. The project expected to be completed in December 2019 (24months).

9 Nyamira  and Kisii Kisii Kisii Water Storage (Bonyunyu Dam) Project

 

 

 

 

ORIO

5,838 The project will require the construction of new physical infrastructure comprising: A dam and storage reservoir at Bonyunyu, an intake structure, 1.5 km long raw water main and treatment plant at Girango, with a daily capacity of 41,000 m3; 11.5 km long treated water transmission main, operating under gravity flow conditions and including passage via a tunnel under Boboracho hill to inlet water tanks near Kisii High school; Extension of the transmission main to Tombe Hills, Minihydropower facility,  Water storage tanks Distribution network, several Kiosks/standpipes Review of feasibility study (Development phase) commenced in May 2016. The study is to be completed in February 2017.
10 Homa bay Rachuonyo north West Karachuonyo water supply project

 

KIDDP

87 Construction of Intake works, 4000m3/day treatment plant, 2.9 km rising main, installation of 2 no. low lift and 2no. High lift pumps The project targets to serve 79,410 people. The project commenced in October 2013 and is currently at 85%. Physical progress. Construction on going to be commissioned by December 2016
11 Homa bay Suba Sindo water supply project

 

 

 

KIDDP

70 Construction of intake works, 1800 m3/day treatment plant, 10 km distribution pipelines, tanks and water kiosks. The project targets to serve 12,000 people. The project started in August 2009 and stalled in 2011 at 60%. The Board retendered incomplete works in 2015 and Contractor has mobilized to site. Work commenced in January 2016 to be completed in September 2016
12 Kisumu, Siaya, Homa Bay, Kisii, Nyamira, Bomet, Kericho Seme, Alego, Rangwe, Bomet Central, North Mugirangu, Ainamoi, Nyaribari Chache and Ugunja Constituency Development projects

 

 

GOK

100 The project comprises drilling and equipping of 5 no. Boreholes, construction of 8 no. pans/dams, construction of 2 no. gravity water supply schemes at Manyororo Murereti and Chuboit and Rehabilitation of Kisumu rural water supply. The projects targets to serve 80,000 people in eight Constituencies. The projects started in January 2015 and to be completed by December 2016.
13 Migori and Homa Bay Migori Town, Homa Bay Town Migori – Homa Bay Sewerage Works (Migori- Homa bay Wastewater (Trilateral Program))

 

 

Kfw

1,900 The project is prepared under Trilateral Development Cooperation between Governments of Kenya, Germany and Israel. The project comprises construction of new sewerage network and treatment system in Migori of capacity 4,000m3/day , expand sewerage network in Homa Bay from 1750m3/day to 4,000m3/day ,develop Industrial Wastewater Control Tool kit, on job –training facility in Kisumu for operators of wastewater systems in LVSWSB region At proposal formulation stage

 

CONSTITUENCY DEVELOPMENT PROJECTS FUNDED BY GoK 

S/No.

County

Constituency

Project name

Scope of works

Estimate cost

Remarks/

1

BOREHOLE DRILLING, CAPPING & TEST PUMPING

1.1

Nyamira

North Mugirango

Nyamatuta Borehole

Drilling, test pumping and capping of 1No. Borehole.

Ksh.2,498,756.00

Contractor is onsite. Drilling in progress to be completed by 7th June 2017

1.2

Nyamira

North Mugirango

Nyamusi Borehole

Drilling, test pumping and capping of 1No. Borehole.

Ksh.2,883,876.00

Borehole drilling Completed.

1.3

Nyamira

North Mugirango

Gitwebe Borehole

Drilling, test pumping and capping of 1No. Borehole.

Ksh.2,723,680.00

Borehole drilled to completion

1.4

Kisii

Nyaribari Chache

Kabosi Borehole

Drilling, test pumping and capping of 1No. Borehole

Ksh.2,520,448.00

Borehole drilled to completion

1.5

Siaya

Ugunja

Sikalame Borehole and Tingare Boreholes

Drilling, test pumping and capping of 2No. Boreholes

Ksh.3,591,128.00

Test pumping completed. Yield 20 m3/hr for Sikalame and 5 m3/hr for Tingare

2

WATER PAN & ASSOCIATD WORKS

2.1

Homabay

Rangwe

Amake Dam

Construction of Dam

Ksh.4,750,240.00

Work in progress 70%.

2.2

Homabay

Rangwe

Kogonda Dam

Construction of Dam

Ksh.4,700,284.60

Work progress at 90% complete extension

2.3

Siaya

Alego

Rabuor Pan

Construction of pan and associated works

Ksh.3,412,706.00

Work ongoing. Progress 95%

2.4

Siaya

Alego

Nyawere Pan

Construction of pan and associated works

Ksh.3,554,958.00

Work ongoing. Progress 50%

2.5

Siaya

Alego

Koga Pan

Construction of pan and associated works

Ksh.2,747,839.00

Work progress – 95 % complete

2.6

Siaya

Alego

Ulafu Pan

Construction of pan and associated works

Ksh 1,978,285.00

Site hand over done on 16th May 2016

2.7

Bomet

Bomet Central

Berirbei Dam

Construction dam and associated works

Ksh.4,947,877.00

Work in progress.  Work progress – 95%

2.8

Bomet

Bomet Central

Soliot Pan

Construction of pan and associated works

Ksh.3,806,081.20

Final inspection to be done.

3

SMALL RURAL WATER SUPPLY SCHEMES

3.1

Kericho

Ainamoi

ManyoroMureret Water Supply

Construction of gravity scheme water supply. Spring protection, Pipeline, 1No.50m3tank,

Ksh.12, 881,539.00.

Work in progress. Overall progress 30%

3.2

Homabay

Suba

Civil works for water supply to suba District Hospital, waondo Youth polytechnic and Majengo

Civil works for supply of water to Suba District Hospital 

Ksh.22,979,198.60

Overall work progress is 40%.

Works in progress.

3.3

Homabay

Rangwe

Rangwe Water Project

Pan excavation, Construction of 1300m3/day 2 No CFUs, pump house and pumps, Clear water tank and risign mainline inclyding 250m3 RC reservoir tank

Ksh49, 057, 469.25

Work ongoing at 94%

3.4

Kisumu

Seme

Rehabilitation of Kisumu Rural Water Supply

Scope of works entails rehabilitation of the water supply, repair of pipelines, filter media, kiosks.

 Scope of works scaled down

kshs. 6,887,100.00.

Work progress 40%

3.5

Kericho

Kipkelion East

Juboit

Construction of Dam.

Ksh 14,000,000.00

Site handing over to be done on 31st May 2016

4

PLANNED RURAL WATER PROJECTS

Kericho

Kipkelion West

Kapngetuny Water Supply

Construction of intake works,gravity mains and ground masonry tanks,.

Design work  ongoing

Under design and tender document preparations

Kericho

Kipkelion East

KiptangitLemotit water project

Rising main and distribution main of total length 5.4 km

Under Design and Tender document preparations

Design and tender documentation under review

Kericho

Kipkelion  East

Tulwap Gravity Water supply

8 km pipeline, spring protection, and construction ofb50 m3 ground masonry tank.

Under Design and tender document preparations

Design and tender documentation under review

Kericho

Kipkelion

Kapseger Borehole

Drilling and equipping of borehole

Under Design and tender document preparations

Design and tender documentation under review

Siaya

Ugunja

Naya Community borehole water supply

Pump installation Rising main, construction 50 m3 ground masonry tank, 850 meter rising main, 3 km distribution pipelines, solar pumping system

Design completed, Tender preparation for borehole equipping and other civil works in progress.

Design and tender documentation under review

Siaya

Ugunja

Uluthe Community borehole water supply

Pump installation Rising main, construction 50 m3 ground masonry tank, 850 meter rising main, 3 km distribution pipelines, solar pumping system

Design completed, Tender preparation for borehole equipping and other civil works in progress

Design and tender documentation under review

Kericho

Kipkelion

Kimologit water project

Gravity main and distribution pipelines

Under design

Under design and tender document preparations

Kericho

Kipkelion

Kutung - techasis water project

Intake, pipelines and ground tank 50 m3

Under Design

Under design and tender document preparations

Kericho

Kipkelion

Mogire Water project

Intake, gravity main and distribution pipelines and ground tank 50 m3 capacity

Under design

Under design and tender document preparations

Kericho

Kipkelion

Mariam Water project

Pipeline and main tank construction of capacity 50 m3

Under design

Under design and tender document preparations

Kericho

Kipkelion

Timbilil water Project

Intake works and pipeline

Under design

Under design and tender document preparations

Kericho

Kipkelion

Nduro Water project

Pipeline and tank construction.

Under planning and design

Under design and tender document preparations

Kericho

Kipkelion

Tendwet water project

Pipelines and 50 m3 masonry ground tank

Under planning and design

Under design and tender document preparations

Bomet

Chepalungu

Nderemiat water pan

Dam Construction

Under planning and design

Under design and tender document preparations

Bomet

Sotik

Kimugul Water Pan

Construction of dam

Under design

Under design and tender document preparations

Homabay

Rangwe

Ngegu Water supply

Construction of gravity water supply

Under design

Under design and tender document preparations

Homabay

Mbita

Tinga(Oseno) Dam

Construction of a dam

Under design

Under design and tender document preparations

 

 PLANNED PROJECTS

S/No

County

Town/Location

Project Name

Financier

Approximate cost in millions KSH

Approximate No. of people to be served

Status

1

NAROK

Kilgoris

Kilgoris water supply and sanitation project

Not Yet

380

80,000

Feasibility study and detailed designs ongoing.

2

NAROK

Lolgorian

Lolgorian water supply and sanitation project

Not Yet

100

40,000

Feasibility study and detailed designs ongoing.

3

Nandi Hills County

Nandi Hills

Nandi Hills water supply and sanitation project

Not Yet

720

85,000

Feasibility study and detailed designs ongoing.

4

SIAYA

Ugunja, Ukwala and Sega

Sega, Ugunja and Ukwala water and sanitation project

Not Yet

850

100,000

Feasibility study and detailed designs ongoing.

5

Bomet

Bomet

Bomet water supply and sanitation project

Not Yet

960

40,000

Feasibility study and detailed designs ongoing.

6

Homa bay

Kendu Bay

Kendu bay water supply and sanitation project

Not Yet

780

30,000

Feasibility study and detailed designs ongoing.

7

Homa bay

Oyugis

Oyugis water supply and sanitation project

Not Yet

940

50,000

Feasibility study and detailed designs ongoing.

8

Homa bay

Mbita

Mbita bay water supply and sanitation project

Not Yet

350

30,000

Feasibility study and detailed designs ongoing.

9

Homa Bay

Ndhiwa

Ndhiwa water supply and sanitation project

Not Yet

350

30,000

Feasibility study and detailed designs ongoing.

10

Migori

Kehancha

Kehancha water supply and sanitation project

Not Yet

400

35,000

Feasibility study and detailed designs ongoing.

 

 

S/No.

County

Constituency

Project name

Scope of works

Estimate cost

Remarks/

1

BOREHOLE DRILLING, CAPPING & TEST PUMPING

1.1

Nyamira

North Mugirango

Nyamatuta Borehole

Drilling, test pumping and capping of 1No. Borehole.

Ksh.2,498,756.00

Contractor is onsite. Drilling in progress to be completed by 7th June 2017

1.2

Nyamira

North Mugirango

Nyamusi Borehole

Drilling, test pumping and capping of 1No. Borehole.

Ksh.2,883,876.00

Borehole drilling Completed.

1.3

Nyamira

North Mugirango

Gitwebe Borehole

Drilling, test pumping and capping of 1No. Borehole.

Ksh.2,723,680.00

Borehole drilled to completion

1.4

Kisii

Nyaribari Chache

Kabosi Borehole

Drilling, test pumping and capping of 1No. Borehole

Ksh.2,520,448.00

Borehole drilled to completion

1.5

Siaya

Ugunja

Sikalame Borehole and Tingare Boreholes

Drilling, test pumping and capping of 2No. Boreholes

Ksh.3,591,128.00

Test pumping completed. Yield 20 m3/hr for Sikalame and 5 m3/hr for Tingare

2

WATER PAN & ASSOCIATD WORKS

2.1

Homabay

Rangwe

Amake Dam

Construction of Dam

Ksh.4,750,240.00

Work in progress 70%.

2.2

Homabay

Rangwe

Kogonda Dam

Construction of Dam

Ksh.4,700,284.60

Work progress at 90% complete extension

2.3

Siaya

Alego

Rabuor Pan

Construction of pan and associated works

Ksh.3,412,706.00

Work ongoing. Progress 95%

2.4

Siaya

Alego

Nyawere Pan

Construction of pan and associated works

Ksh.3,554,958.00

Work ongoing. Progress 50%

2.5

Siaya

Alego

Koga Pan

Construction of pan and associated works

Ksh.2,747,839.00

Work progress – 95 % complete

2.6

Siaya

Alego

Ulafu Pan

Construction of pan and associated works

Ksh 1,978,285.00

Site hand over done on 16th May 2016

2.7

Bomet

Bomet Central

Berirbei Dam

Construction dam and associated works

Ksh.4,947,877.00

Work in progress.  Work progress – 95%

2.8

Bomet

Bomet Central

Soliot Pan

Construction of pan and associated works

Ksh.3,806,081.20

Final inspection to be done.

3

SMALL RURAL WATER SUPPLY SCHEMES

3.1

Kericho

Ainamoi

ManyoroMureret Water Supply

Construction of gravity scheme water supply. Spring protection, Pipeline, 1No.50m3tank,

Ksh.12, 881,539.00.

Work in progress. Overall progress 30%

3.2

Homabay

Suba

Civil works for water supply to suba District Hospital, waondo Youth polytechnic and Majengo

Civil works for supply of water to Suba District Hospital 

Ksh.22,979,198.60

Overall work progress is 40%.

Works in progress.

3.3

Homabay

Rangwe

Rangwe Water Project

Pan excavation, Construction of 1300m3/day 2 No CFUs, pump house and pumps, Clear water tank and risign mainline inclyding 250m3 RC reservoir tank

Ksh49, 057, 469.25

Work ongoing at 94%

3.4

Kisumu

Seme

Rehabilitation of Kisumu Rural Water Supply

Scope of works entails rehabilitation of the water supply, repair of pipelines, filter media, kiosks.

 Scope of works scaled down

kshs. 6,887,100.00.

Work progress 40%

3.5

Kericho

Kipkelion East

Juboit

Construction of Dam.

Ksh 14,000,000.00

Site handing over to be done on 31st May 2016

4

PLANNED RURAL WATER PROJECTS

Kericho

Kipkelion West

Kapngetuny Water Supply

Construction of intake works,gravity mains and ground masonry tanks,.

Design work  ongoing

Under design and tender document preparations

Kericho

Kipkelion East

KiptangitLemotit water project

Rising main and distribution main of total length 5.4 km

Under Design and Tender document preparations

Design and tender documentation under review

Kericho

Kipkelion  East

Tulwap Gravity Water supply

8 km pipeline, spring protection, and construction ofb50 m3 ground masonry tank.

Under Design and tender document preparations

Design and tender documentation under review

Kericho

Kipkelion

Kapseger Borehole

Drilling and equipping of borehole

Under Design and tender document preparations

Design and tender documentation under review

Siaya

Ugunja

Naya Community borehole water supply

Pump installation Rising main, construction 50 m3 ground masonry tank, 850 meter rising main, 3 km distribution pipelines, solar pumping system

Design completed, Tender preparation for borehole equipping and other civil works in progress.

Design and tender documentation under review

Siaya

Ugunja

Uluthe Community borehole water supply

Pump installation Rising main, construction 50 m3 ground masonry tank, 850 meter rising main, 3 km distribution pipelines, solar pumping system

Design completed, Tender preparation for borehole equipping and other civil works in progress

Design and tender documentation under review

Kericho

Kipkelion

Kimologit water project

Gravity main and distribution pipelines

Under design

Under design and tender document preparations

Kericho

Kipkelion

Kutung - techasis water project

Intake, pipelines and ground tank 50 m3

Under Design

Under design and tender document preparations

Kericho

Kipkelion

Mogire Water project

Intake, gravity main and distribution pipelines and ground tank 50 m3 capacity

Under design

Under design and tender document preparations

Kericho

Kipkelion

Mariam Water project

Pipeline and main tank construction of capacity 50 m3

Under design

Under design and tender document preparations

Kericho

Kipkelion

Timbilil water Project

Intake works and pipeline

Under design

Under design and tender document preparations

Kericho

Kipkelion

Nduro Water project

Pipeline and tank construction.

Under planning and design

Under design and tender document preparations

Kericho

Kipkelion

Tendwet water project

Pipelines and 50 m3 masonry ground tank

Under planning and design

Under design and tender document preparations

Bomet

Chepalungu

Nderemiat water pan

Dam Construction

Under planning and design

Under design and tender document preparations

Bomet

Sotik

Kimugul Water Pan

Construction of dam

Under design

Under design and tender document preparations

Homabay

Rangwe

Ngegu Water supply

Construction of gravity water supply

Under design

Under design and tender document preparations

Homabay

Mbita

Tinga(Oseno) Dam

Construction of a dam

Under design

Under design and tender document preparations

Our Partners

 

 

 

Location

Lavictors House,
Off Ring road Milimani

Address

P.O. BOX 3325-40100,
KISUMU, KENYA

Email Us

customercare@
lvswaterboard.go.ke

Call Us

(+254) 057-2025128
(+254) 057-2025127

Follow Us